Client: Municipality of Henstedt-Ulzburg
Design team: Lysann Schmidt (landscape architect) + Herr & Schnell architects (herrschnell.com/beckersberg)
Location: Henstedt-Ulzburg, Germany
Date: 2019
Surface: 290.000 m²
Based on the existing path structure we created a public circular route (“Loop”) which improves the orientation and becomes a metaphorical and physical link between the different stakeholder groups, the functional areas in the Bürgerpark and the landscape typologies. Natural swimming pool, stadium, sports-landscape, educational facilities, teaching pool, Kulturkate, grove, water lily pond and children’s play area.